If it doesn't have an impact, why bother?!
Full-Color, Double-Sided 4×6...
Project Details
Cover design for second issue of online periodical, Six Twelve Magazine....
Project Details
Full Color, Double-Sided flier designed for motorcycle club, Team Neva’s, Annual “Ride 4 Peace” event held in Pittsburgh,...
Project DetailsI am constantly in the process of learning and exploring new software and trends in the ever-changing design field.
Thank you for visiting my online portfolio. I will be updating the site regularly with new projects and blog postings.
accessed on 12 October 2015. Retrieved on 13 October 2015. published on 30 September 2015.[contact-form 1 "Contact form 1"]